Warwick Energy successfully developed the smaller Barrow project before selling the scheme to a consortium of European energy companies in September 2003.
The Barrow scheme comprises 30 wind turbines. Development consent was granted in March 2003. and the 90 MW became fully operational in 2006.
- Wind Energy - Myths and Facts